09/25/2006
Whitehall Ferry Terminal, New York, NY
2006 Project Innovations recipient, submitted by Tishman Construction Corp.
| | 14 Crosby Drive, Bedford, MA | | 33 Hayden Avenue Lobby Renovation, Lexington, MA | | 75 Piedmont Avenue LLC, Atlanta, GA | | 300 Wyandotte, an HOK Sport companies headquarters building, Kansas City, MO | | Advocate Good Shepherd Hospital Cardiac Care Center, Barrington, IL | | CDER Office Building 1, FDA Consolidation Project, White Oak, MD | | The Coyle Co., Boston, MA | | CreekBridge Village, Salinas, CA | | Hauptman-Woodward Institute, Structural Biology Research Center, Buffalo, NY | | Inter-Industry Conference of Auto Collision Repair World Headquarters, Hoffman Estates, IL | | Kaiser Downey MOB 1, Downey, CA | | Monte Carlo Resort & Casino, Las Vegas, NV | | Montgomery County Commissioners Performance Contract, Dayton, OH | | Scranton Information Service Center (SISC), Scranton, PA | | Star Software, Warner Robins, GA | | UW Cancer Center at Johnson Creek, Johnson Creek, WI | | Whitehall Ferry Terminal, New York, NY | | The Wisconsin Heart Hospital, Wauwatosa, WI |
|
Submitting Company Tishman Construction Corp., New York, NY Project Team (not all-inclusive) NYC Economic Development Corp. and NYC Department of Transportation, owners; Tishman Construction Corp. and Frederick R. Harris Inc., construction managers; Schwartz Architects, lead architect; TAMS Consultants Inc., production architect; Flack + Kurtz, MEP engineer; Robert Silman Associates PC, structural engineer; Ysrael A. Seinuk, civil engineer; ADF Steel Corp., steel contractor; Prismatic Development Corp., concrete contractor; Five Star Electric, electrical contractor; WDF/Greene, plumbing contractor. Project Specifics Building type/use: Multi-modal transportation hub Square footage: 200,000 square feet Project cost: $201 million Project completion: February 2005 Product Suppliers (not all-inclusive) - Johnson Controls
- KONE Inc.
- W & W Glass
For 101 years, the Staten Island Ferry has been the only non-vehicular mode of transportation between Manhattan and Staten Island, transporting 20 million commuters annually on a scenic, 5-mile voyage across Upper New York Harbor. The new terminal includes a 19,000-square-foot waiting room, 10,000 square feet of office space, 10,000 square feet of ancillary support and ferry operation rooms, and 6,000 square feet of concessions. It replaces the original 1907 Whitehall Ferry Terminal, which was badly damaged in 1991 by a fire that completely destroyed its main waiting room. An interim waiting room opened in 1992. The new inter-modal Whitehall Ferry Terminal was designed to provide uninterrupted ferry servÂÂice to 75,000 daily commuters plus tourists and create efficient connections to subway, bus, and taxi services. Special Design Features Reinforcing its “Gateway to Manhattan” image and location, the airy, contemporary building features a 75-foot-high entry hall with a glass façade that provides panoramic views of the Lower Manhattan skyline and New York Harbor. Above the terminal are photovoltaic solar panels, supplying a portion of the building’s power. Whitehall Ferry Terminal boasts a new, state-of-the-art heating and air-conditioning system, including a radiant floor, a high-tech public address system, and programmable interior and exterior LED signage capable of transmitting moving images and text in full color. Design/Construction Challenge As Lower Manhattan’s main transportation hub, the terminal required complex construction phasing to allow two of the three ferry slips to be in continuous operation for the duration of the project. Work was planned around a detailed schedule based on such items as removing a ferry slip from service, completing construction of each slip, providing access to the new slip for the ferry passengers, returning the slip to service, and removing the next slip from service.
Learn how to earn LEED® credits with Siemens Green Building Portal.
This user-friendly online tool will help you understand key requirements for the USGBC's New Construction and Existing Building (NC and EB) LEED rating systems. In addition, it demonstrates how our solutions can help meet and support your specific LEED certification objectives. Our suite of Green Online Tools also includes a Greenhouse Gas Calculator to help you measure your carbon footprint and a Green Touchscreen that demonstrates how you can educate the public about your sustainability efforts.
Whether your need is light repair, handyman services, or a full scale maintenance operation for your facility, Varsity is dedicated to providing outstanding facility maintenance services. Providing facility maintenance in hundreds of properties across North America has given us the experience and expertise necessary to meet your needs at a competitive price. Call 888.888.1130 or email MCollings@Varsityfs.com.
EasyLobby Visitor Management automates the entire process of registering a visitor and printing visitor badges. Improve an organization’s image and enhance security. Capture detailed visitor information in seconds without typing, while keeping all visitor information confidential. Comprehensive visitor registration, tracking, reporting, badge printing, web-based pre-registration and access control integration. Scalable from a single system to hundreds. Thousands of installations worldwide. Our products include software, hardware peripherals and badge stock. Free, no-obligation demo available.
We Can Help You Reduce Energy by 30%
Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.
|