October 2008
A Century of History Revived
Modernization Citation of Excellence: The Plaza Hotel, New York, NY

Citation of Excellence The Plaza HotelNew York, NY Submitting Company: Tishman Construction Corp., New York, NY Project Team: (not all-inclusive) El-Ad Group, owner/developer; Costas Kondylis & Partners LLP, architect; Gal Nauer Architects, designer; Tishman Construction Corp., construction manager; Flack + Kurtz, mechanical engineer; WSP Cantor Seinuk, structural engineer; David V. Abramson & Associates, façade consultant; DCM Erectors Inc., structural steel fabricator/erector; FMB Inc., misc. steel fabricator/erector; United Iron Inc., misc. steel fabricator/erector; Empire Architectural Metal Inc., architectural/ornamental metal fabricators/erectors Project Specifics: Building type/use: hospitality Square footage: 940,000 square feet Project cost: $400 million Project completion: October 2007 Products Used: (not all-inclusive) Doors/Storefronts/Hardware: Long Island Fireproof Door Inc. Elevators/Escalators: Transel Elevator Inc. Lighting: Encore Lighting Software: Primavera Systems Inc. Window Film/Shading: Architectural Window Mfg. Corp. Windows/Glass: Architectural Window Mfg. Corp.
By Maureen Orsborn IMAGES New York City's The Plaza Hotel has charmed the world for more than a century. The iconic structure overlooking Central Park and Grand Army Plaza is considered one of New York's most remarkable buildings, both for its architectural design and its social significance. When owner-developer El-Ad Group purchased the hotel for $675 million in 2004, it initiated a restoration project that would modernize the building and revive its old-style glamour. In order for the hotel to reopen in time for its 100th anniversary (it originally opened in 1907), the project had to be completed in less than 3 years. The Plaza Hotel, and several of its interior spaces, has been granted landmark status, so accurate restoration was mandatory. The design team dug deep, researching city files for photos, drawings, and blueprints of the building. Landmark-status interior spaces had been painted numerous times over the years, so the rooms' original colors had to be uncovered through research, sampling, and scientific testing. The building's white brick and marble façade needed only a thorough cleaning, but the green mansard roof required extensive repair. Original-tile reproductions were installed, and the copper finials were replaced with vintage-style copies. From the Grand Ballroom to the marble staircases, the interior of the building required extensive restoration. Floor layouts were reconfigured to transition a portion of the hotel into residential space, and infrastructure had to be removed to make room for new mechanical systems. The hotel's courtyard underwent a $20 million upgrade. Two levels were added above the famous Palm Court to make room for a spa and an ornate outdoor courtyard with a reflecting pool and extensive landscaping. The structural engineers devised a creative method to bring pre-assembled steel trusses into the courtyard - they threaded them through windows on 59th Street and out through 58th Street. The trusses were suspended by cables until they were aligned, infilled, and connected. The Palm Court's Louis Comfort Tiffany dome light, one of the hotel's most recognizable features, was recreated during the restoration. Chicago-based Botti Studio of Architectural Arts used photos and glass fragments from the original dome to recreate the 42-foot by 38-foot stained-glass light, which is illuminated from behind by an adjustable lighting system. The trusses used for the construction of the new courtyard also support this historic lay light. To update the building, prior hotel space was replaced with a combination of hotel rooms, condos, and "hotel condos." Architects added curtainwall and Juliet balconies to the façade of the hotel facing the courtyard, and some hotel rooms were expanded using cantilever construction. Their frames were trimmed in aluminum finished with the look of aged copper. Roof space that formerly contained mechanical systems and storage space has been converted to a floor of penthouses. A retail component on the lower floors gives the hotel a more contemporary feel. To ensure that the restoration was completed on time, demolition ran concurrent with the design process, and restoration was completed by doing one section of the building at a time. In 2007, the doors of The Plaza Hotel reopened, marking the start of a new century of luxury living and hospitality. Maureen Orsborn is a contributing editor at Buildings magazine. Judges' Comments "This sensitive refurbishment/replacement of many lost architectural gems—including the replacement of the destroyed original dome light by Louis Comfort Tiffany in the Palm Court - has resulted in bringing this hotel to the forefront of the traveling elite. This project is highlighted by meticulous attention to detail throughout; the quality of the interior design is stunning. The original interior, based upon a French Renaissance chateau, has been respected to the fullest. Was there ever a chateau as grand as this? It's hard to imagine." |
IMAGES: 



back to top
 Polyiso is one of the most widely-used and cost-effective insulations for roof and walls. Highest R-value per inch of thickness; Moisture resistant, water repellent panel; Resistant to solvents used in construction adhesives; Excellent dimensional stability; Superior performance in fire tests – meets strict standard of FM Class Approvals & UL 1256/ULC S126; Long Term R-value (third party certification); Recycled content; Zero ozone depletion potential; Virtually no global warming potential
 Polyiso is one of the most widely-used and cost-effective insulations for roof and walls. Highest R-value per inch of thickness; Moisture resistant, water repellent panel; Resistant to solvents used in construction adhesives; Excellent dimensional stability; Superior performance in fire tests – meets strict standard of FM Class Approvals & UL 1256/ULC S126; Long Term R-value (third party certification); Recycled content; Zero ozone depletion potential; Virtually no global warming potential
DSX Access Systems, Inc.
DSX Integrated Access Control Systems: Securing the World One Door at a Time - From Small to Enterprise-Wide Integrated Systems – DSX products are considered to be the finest in the industry because of their Quality, Reliability and Integrity. Thus making them the Security Professionals first choice.
DSX makes it easy for you to stand firm, stand tough any where threats arise in today’s challenging security environments.
Visit www.dsxinc.com or e-mail at sales@dsxinc.com
 Forbo Flooring Systems is the world leader in linoleum flooring, as well as a major producer of commercial entry systems, vinyl and Flotex - a better alternative for textile flooring. Forbo Flooring is committed to protecting the natural environment and investing in a sustainable future by constantly seeking to create more environmentally friendly products and processes. When it comes to an environmentally friendly product, Marmoleum is an outstanding choice.
 You’re planning to replace windows in one of your existing buildings, consider window replacement solutions from Pella. Product options include aluminum-clad wood, wood, fiberglass, and vinyl windows and doors and a variety of installation systems that reduce your installation costs. In addition, Pella’s products are perfect for new construction projects and can be used in numerous configurations such as punched openings, entrances, storefronts and window wall applications. For more information, visit www.pellacommercial.com.

The AIA provides easy-to-use, pre-drafted standardized contracts written by legal and industry experts that are time-tested by contractors, owners, architects and lawyers nationwide. The latest version of AIA Contract Documents software gives users access to 100+ of the most widely-accepted forms and agreements and is built on a Microsoft-Word platform, making it easy to write, edit and share documents. Microsoft Excel® is now built into all Application for Payment and Change Order forms ensuring accurate calculations. Feel confident using AIA Contract Documents.
Adams Rite has a 115 year heritage of quality and reliability, and has become a leader in architectural hardware by offering innovative lines of electric strikes, exit devices, swinging door and sliding door hardware. Today, Adams Rite also manufactures The RITE Door®, an integrated door system with pre-installed hardware, and a full line of access control devices. Its Markar division offers an adjustable hinge, which features 3/8" adjustable leeway for perfect alignment of doors and frames.
Trespa International BV is a world leader in the development, production and delivery of high-performance, high-quality panels for exterior cladding, decorative facades and interior surfaces. Using proprietary technologies for the manufacture of exceptionally durable products, Trespa is continually setting new standards in the building sector, life-style settings and environmental awareness and sustainability.
At Siemens, we work with our customers to help them manage their buildings' energy use, improve reliability and enhance performance. We recognize that high performance buildings make for high performance business—energy is the lifeline of your facility. From energy procurement to efficient system design and installation, from energy generation to comprehensive auditing and performance reporting - Siemens has the answers.
To leave your comment please login or register.
No comments
|
|
|
|
|
|
|
|
|
|
|
|
|
|