BUILDINGS - Helping Facilities Professionals Make Smarter Decisions
Subscribe | My Account | Login
  • Home
  • Publications
  • Events
  • Building Products
  • BUILDINGS VIP and Education
  • Resource Center
  • CEUs
BUILDINGS Magazine Online @ The Moment Newsletter Security Newsletter Roofing Newsletter Energy Newsletter Greener Facilities Newsletter
Upcoming Events Calendar of Events Events from BUILDINGS ABBY Awards Product Innovations Awards Webinars
Building Products Request Free Product Info Product Innovations Awards
Webinars on BUILDINGSVIP™ Other On-Demand Webinars BUILDINGS Self-Paced Learning
Smart Technology Whitepapers Case Studies Catalogs Green Guide Lean FM Articles Sponsored Content BUILDINGS'  Bookstore Video BUILDINGS'  RSS Feed
CEU Articles CEU Test Center

The BUILDINGS brand serves commercial building owners and facilities management professionals for commercial real estate. BUILDINGS brand offers its audience of commercial building owners and facilities management professionals information on the development, construction, modernization, management and operations of commercial buildings as well as the products and services needed to support such commercial buildings and facilities management. With the information we offer, we help facilities management professionals make smarter decisions for commercial buildings.

* required fields

From*

To*

Message

cancel
Sending...
Email to a friend Printable version Article reprints

12/10/2008

Roof-System Performance III

Home
Advertising
Contact Us
THE SOURCE
December 2008 - Issue 81
Featured Sponsor
 

MBCI SSR Systems: Cool and Green

MBCI offers a choice of six separate standing seam roof systems in mechanically field-seamed or snap-together systems. Ask about our industry leading Weathertightness Warranty and Certified Installer programs. In addition to a large choice of Cool Roof colors, MBCI metal roofing systems offer many Green features for LEED compliant projects, including a content of 25 – 35 percent recycled material, and are 100 percent recyclable products reducing landfill usage.

For more information visit www.mbci.com

Roof-System Performance III

By Richard L. Fricklas

The last two issues of this newsletter looked at historical attempts to develop performance specifications for certain roofing projects. The CIB/RILEM FIT system was an attempt to quantify attributes that might be needed for a specific roof project. I listed some levels of performance for a few roof systems that, in general, would meet specific project requirements.

Another example in this performance series is ASTM E936 (last updated in 2004), titled Roof System Assemblies Employing Steel Deck, Preformed Roof Insulation, and Bituminous Built-Up Roofing. 

Bill Maroni of Factory Mutual (now FM Global) conceived this amazing document back in the 1970s. From an insurance perspective, it became apparent to FM Global that most roof failures could not be attributed to just a single element; it was the system that needed to be correctly put together. Since bituminous roofing was dominant in the 1970s, the committee that Maroni assembled focused on bituminous roofing, with steel decking and rigid roof insulation as the major components. Much of the work of this Committee on Roof Assemblies (CORA), however, is equally relevant to single-ply systems as well.

The scope of ASTM E936 is worth reviewing:

This practice covers the performance requirements for the design, components, construction, and service expectations of new roof system assemblies. For this purpose, the roof system always includes steel deck, preformed roof insulation, and bituminous built-up roofing, and their attachment. It may also include fire-resistive components, integral acoustical treatment, vapor retarder, adhesive or mechanical fastener attachment, and aggregates.

Richard (Dick) L. Fricklas was technical director emeritus of the Roofing Industry Educational Institute prior to his retirement. He is co-author of The Manual of Low Slope Roofing Systems, and continues to participate in seminars for the University of Wisconsin and RCI Inc.-The Institute of Roofing, Waterproofing, and Building Envelope Professionals. His honors include the William C. Cullen Award and Walter C. Voss Award from ASTM, the J. A. Piper Award from NRCA, and the James Q. McCawley Award from the MRCA. Dick holds honorary memberships in both ASTM and RCI Inc.

Since this newsletter is part of a series on roof performance, the next paragraph of E936 sets the stage for our discussion:

The objective (of this document) is to provide realistic criteria for the overall performance of the roof assembly and its components because by necessity and custom, a roof assembly contains a variety of components and is subject to varied environmental conditions.

Performance Concepts
Design. The roof system should be designed in accordance with this practice to resist the effects of the usual or normal weather and loading conditions, which can cause excessive deflection, destroy adhesive bond, fracture the insulation, and result in premature failure of the roof system. Such weather and loading conditions may include, but are not confined to, water, wind, hail, snow, ice, uniform and concentrated loading, and thermal expansion and contraction of building units. The roof system should be sloped to provide drainage under design loading conditions, and the design should sustain the anticipated live load if drainage is obstructed.

Construction. During construction, the partially completed and the completed roof assembly should:

  • Be protected against construction traffic and equipment to be used in the construction of the roof assembly and subsequent traffic and use by other trades.
  • Provide weather protection consistent with the construction schedule requirements as determined by existing weather conditions.

Service. The roof system assembly, when in service, should:

  • Be protected against anticipated building maintenance procedures.
  • Provide weather protection.
  • Provide thermal insulation.
  • Provide a vapor retarder, if required.
  • Provide fire-safety and uplift resistance as required by the building owner, applicable building codes, or insurance underwriters.
  • Carry anticipated design dead loads and live loads.
  • Receive proper and periodic maintenance over its service life.
  • The components used in the roof system assembly should be compatible with each other.

Design, Materials, and Construction Requirements. All components of the roof system should conform to specific design criteria essential to provide an assembly capable of fulfilling the performance concepts.
Note 1: The spacing and straightness of the steel deck supports are important to proper deck installation and should be confirmed by the designer or their representative.
Note 2: For locations other than roof edge and nonwall supported details, the need for wood nailers should be determined by the designer or specifier.
Note 3: The first layer of the preformed insulation can be more positively secured by mechanical fasteners with the additional layers of preformed insulation fully adhered to the first layer.

The ASTM document goes on to discuss testing of components and protection of materials, and recommends that a pre-roofing conference be conducted prior to the erection or assembly of the roof system.

Under requirements for components, the document provides two full pages of detail pertaining to steel roof decks. Of particular note is yield strength:

The minimum yield strength of the steel (Fy) should be 228 MPa (33,000 psi). (Currently, many roof systems require 80,000 psi [80 ksi] in order to achieve uplift forces.)

Allowable Span determination shall be the lesser of concentrated load deflection, uniform live load, or concentrated loading deflection. Concentrated load is based upon a 300-pound load on the midspan of a single-span deck, representing a hefty roofing installer carrying an armload of materials or perhaps a fully loaded ballast-spreading machine. Roofing mechanisms should be limited to 300 pounds per wheel located not closer than 30 inches apart and bearing no less than 4-inch tread width.

All deck openings that exceed 12 by 12 inches should be reinforced.
At changes in deck direction or plane, such as at ridges, valleys and hips, a sheet-steel closure plate not less than 0.024-inches thick by 8-inches wide, bent to conform to the deck planes, should be provided.

Vapor retarders are also discussed. Another excerpt follows:

Permeance should be less than 2.87 • 10-11 SI perms (0.5 Perms) when tested by Test Method E 96, Procedure A, Desiccant Method at 23°C. Retarders shall be covered by the insulation and roofing membrane at the end of each working day.

Preformed Roof Insulation
While many requirements are covered by individual ASTM specifications, shape stability deserves particular attention, especially with ASHRAE’s upgrading of total thermal resistance to R-20 (single layers of Isoboard, for example, would be thicker than 3 inches).

  • Shape stability. Insulation units should not curl or bow, when properly adhered or fastened, more than 3 millimeters (1/8 inch) in 1200 millimeters (4 feet).
  • Insulation boards should be butted together. All joints over 6 millimeters (1/4-inch) wide should be filled with insulation.
  • Insulation installed in multiple layers should have the joints offset, preferably on-half board (minimum of 6 inches) between layers.
  • Attachment of the bottom layer should be by mechanical fasteners.

This is still valid today. Low-rise foam adhesives are not currently approved by FM Global over steel roof decks.

Insulation Fasteners
Mechanical fasteners are well understood by the roofing industry. According to ASTM E936, “The hardness of the steel deck should be considered when selecting the insulation fasteners” and “corrosion resistance shall exhibit (not more than) minimal traces of rust spots when tested by Method B117 for 48 hours.” (This is a salt spray test that should be updated to Kesternich or Sulfur Dioxide Testing [ASTM G87]).

Bituminous Roofing
This section addresses conventional built-up roofing (BUR), but could be adopted for modified bitumen (MB) systems as well. Perhaps, in the future, we will see a document such as E936 dedicated just to MB or single-ply systems.

Other Components
There is little doubt that flashings are more troublesome than any other component of a roof system. Under general guidelines, the following information from E936 is of interest:

Pitch pans filled with asphalt or coal tar bitumen or plastic cement are the least satisfactory means of flashing roof penetrations and should be avoided. (Pourable sealer or premolded boots are vastly superior.)

All units installed on supports above the roof shall provide easy access for a worker to reach at least half the width under the unit if necessary, to repair the roof or the equipment. An access height of 600 millimeters (24 inches) is considered minimum to facilitate satisfactory repair work when necessary, or higher if size of unit warrants.

Roof System Evaluation
Field inspection, testing, field verification, and certification are all addressed in E936, even including a sample historical record form.

ANNEX to E936 (mandatory information) contains several pages of standard roofing details, excerpted from The NRCA Roofing and Waterproofing Manual.

APPENDIX to E936 (non-mandatory information) includes a section on roof consultants, including the following definition:

An individual or firm of established competence having professional qualifications as a roofing consultant and who is engaged in the field of roofing technology. They may also maintain a regular force of professionals and technicians.

Similar sections can be found on testing laboratories, owners and designers, fire performance, mediation services, and moisture evaluation. The entire E936 document can be obtained from ASTM Intl.

While much of the above information is available from NRCA, other trade associations, FM Global, and Underwriters Laboratories (UL), this document represents a consensus of the best prescriptive information on low-slope roofing. Since the industry may never see true performance specifications, documents such as E936 can play a major role in insuring that roof systems perform as intended. Since sustainability has become a buzzword of this decade, good design, materials, and installation are more important than ever.

Resources:

  • Asphalt Roofing Manufacturers Association
  • ASTM International
  • Council for Performance Criteria for Constructed Roof Systems
  • EPDM Roofing Association
  • National Research Council Canada
  • National Roofing Contractors Association
  • RCI Inc.
  • Single Ply Roofing Industry

Previous Issues

November 2008 Roof-System Performance II
October 2008 Roof-System Performance
September 2008 Roof Surveys and Plans
August 2008 Ballast Can Do It All
July 2008 Greener than Green
June 2008 Finding and Fixing Leaks
May 2008 Roof Insulation and Diminishing Returns
April 2008 Back to Square One
March 2008 Venezuelan Oil and Green Roofs
February 2008 Installing Membrane Roofing Using Foam Adhesives
January 2008 ASTM, RCI, and Quality Assurance
December 2007 ASTM and Roofing
November 2007 Thermoplastic (Heat-Weldable) Roofing

And don't forget to check out Buildings TV

Newsletter Sponsorships

Want to reach nearly 40,000 Facility Professionals each month?

Become one of our E-mail Newsletter Sponsors!
• Call Mary Diers at (319) 389-9381 or send an e-mail.

(Return to Top)
--- Exclusive Online Content ---

  • @ the Moment - weekly newsletter of topical issues for facilities professionals.
  • Greener Facilities - understand the explosive growth and acceptance of green buildings.
  • Roofing News - in-depth roofing information for the facilities professional.
  • Bottom Line Energy Issues - in-depth energy information for the facilities professional.
  • Security News - in-depth security information for the facilities professional.

THIS DOCUMENT AND OTHER DOCUMENTS PROVIDED PURSUANT TO THIS PROGRAM ARE FOR INFORMATIONAL PURPOSES ONLY. The information type should not be interpreted to be a commitment on the part of Stamats Communications and Stamats Communications cannot guarantee the accuracy of any information presented after the date of publication. INFORMATION PROVIDED IN THIS DOCUMENT IS PROVIDED 'AS IS' WITHOUT WARRANTY OF ANY KIND. The user assumes the entire risk as to the accuracy and the use of this document. Buildings.com newsletter e-mail may be copied and distributed subject to the following conditions:
1. All text must be copied without modification and all pages must be included.
2. All copies must contain Stamats Communications' copyright notice and any other notices provided therein.
3. This document may not be distributed for profit

Published by:
Stamats Business Media
615 5th Street S.E., PO Box 1888
Cedar Rapids, Iowa 52406-1888

From the publishers of


Sponsored Links:

Get the complete picture in late February. Coming soon from Fluke: Our easiest-to-use thermal imagers ever. Sign up and be the first to learn more.

Manage visitors more securely and professionally with EasyLobby. Automate the entire process of visitor registration and badge printing. Free demo.

Connectrac’s floor wireway systems are more subtle and powerful than ever.

New 4600 Series designer deadlatch lever trim by Adams Rite has 11 styles and 7 finishes. Strong enough for heavy traffic, beautiful enough to stop it.

LEED CERTIFICATION is the best way to ensure that your buildings are as environmentally friendly as possible! Visit greenedu.com to learn more.

Build a BASYS™ sensor faucet with Sloan’s online configurator. Choose the right model based on style, power/sensor type and many advanced features.

Floor and Décor Outlets offer the widest selection of glass tiles, granite tiles, laminate flooring and Atlanta hardwood floors selections.

Are you looking to create an environmentally responsible and resource-efficient building? Join us for the Smart Sustainability Expo on March 6 to gain the knowledge you need on sustainability. It's FREE, so register today!

Visit our Resource Center: Download FREE Whitepapers, Case Studies and Catalogs


close this advertisement

BUILDINGS delivers relevant and timely information that equips commercial building owners and facilities management professionals with the knowledge and support they need to solve critical issues; energy management, lowering operating costs, new products for commercial buildings, security, and much more.

BUILDINGS provides facilities management professionals commercial buildings tips and trends trough online webinar events (BuildingsVIP), monthly newsletters, whitepapers and case studies.

In addition to content, BUILDINGS features a comprehensive list of products and services and is your link to the companies that provide these valuable facilities management and commercial buildings resources.

You also have the opportunity to maintain your commercial buildings certifications with BUILDINGS. Continuing Education Units are available with approved content from BOMI.


  • Home
  • About
  • Advertise
  • Project Innovations Awards
  • Product Innovations Awards
  • BUILDINGS News Review
  • Building Products
  • Request Free Product Info
  • Video
  • Resource Center
Systems
  • Access Control
  • Acoustics
  • Alternative Energy
  • Building Controls
  • Ceilings
  • Communications
  • Daylighting
  • Digital Signage
  • Disaster Preparation & Recovery
  • Doors
  • Electrical
  • Energy Management
  • Facades & Curtainwall
  • Fire Protection
  • Furniture
  • Green Building Operations
  • HVAC
  • Insulation
  • Legislation & Codes
  • Life/Fire Safety
  • Lighting
  • Lighting Controls
  • Pest Control
  • Renewable Energy
  • Renovation
  • Roofing
  • Security
  • Solar
  • Sound Masking
  • Steel
  • Vertical Transportation
  • Walls
  • Windows & Accessories
  • Wiring
  • My Account
  • RSS Feed
  • Contact Us
  • Subscribe
  • Sitemap
  • Privacy Statement

  • Stamats Business Media
  • Interiors & Sources


©Copyright 2011 Stamats Business Media Inc. All rights reserved / BUILDINGS