Originally published in Interiors & Sources

02/24/2012

New Parkland Hospital by HDR + Corgan

The new Parkland Hospital is estimated to be completed in 2014

By Adam Moore

 
  • /Portals/3/images/magazine/2012/0312/I_0312_Web_OTH_1.jpg

    View larger

  • /Portals/3/images/magazine/2012/0312/I_0312_Web_OTH_2.jpg

    View larger

  • /Portals/3/images/magazine/2012/0312/I_0312_Web_OTH_3.jpg

    View larger

After 56 years of serving Dallas-area residents as a Level I trauma center and a teaching hospital for the University of Texas Southwestern (UTSW) School of Medicine, Parkland Memorial Hospital is preparing for retirement. And while it’s never easy to lose an iconic institution, its replacement looks to be more than capable.

Designed in a joint venture between HDR and Corgan, the new Parkland Hospital will provide the area’s 2.1 million residents with a state-of-the-art, sustainable healthcare hub.

The 1.9 million-square-foot, 862-bed hospital will incorporate a host of evidence-based and lean design principles intended to improve healing and patient comfort. Patient rooms have been designed to be acuity-adaptable, reducing intra-hospital transfers, while nursing stations have been decentralized to increase staff time spent on direct care. Circulation has been zoned to separate on-stage (patients, family, visitors and caregivers) and off-stage traffic (supplies, laundry, food service), reducing noise and congestion. Rubber flooring has also been specified in patient corridors to further reduce noise and minimize falls.

Designers have aimed to put the “park” back in “Parkland,” by including extensive views of nature from inside each patient room, as well as a central “wellness park,” a two-acre island of trees and plants that can be accessed only by patients, staff and visitors. The park will include a meditation garden connected to the hospital, with large doors opening directly into the chapel. Separate respite gardens will be provided for staff.

The finished facility will also target Leadership in Energy and Environmental Design (LEED) Silver certification. Sustainable design elements will include the use of daylight harvesting in patient rooms and public spaces, rainwater collection for landscape irrigation, and the use of recycled and local building materials.

Crews broke ground on the new Parkland Hospital in late 2010; it is estimated to be completed in 2014. For more information about the project, visit http://newparkland.parklandhospital.com/.

 

 

Lower costs. Increase operational efficiency. Detect problems before they're problems. Johnson Controls is reinventing building efficiency.

Learn more .

Lower costs. Increase operational efficiency. Detect problems before they're problems. Johnson Controls is reinventing building efficiency.

Learn more .

Lower costs. Increase operational efficiency. Detect problems before they're problems. Johnson Controls is reinventing building efficiency.

Learn more .

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Need portable cooling?

Rent or buy spot coolers from full-service locations nationwide. On call “24/7”. Primary, supplemental or emergency cooling. Atlas Sales & Rentals, Inc., or call (800) 972-6600.

Click here for more info

Sloan Performance Also Comes in White

Mitsubishi Electric Cooling & Heating is transforming HVAC with advanced Variable Refrigerant Flow (VRF) zoning solutions that totally redefine efficiency. VRF zoning systems offer lower lifecycle costs, less maintenance, better performance and reliability which lead to increased overall building efficiency. And all at a price that fits within your budget. Let Mitsubishi Electric help you redefine your HVAC efficiency as well as what you can achieve in your buildings.
Learn more www.mitsubishipro.com/redefined

Lower costs. Increase operational efficiency. Detect problems before they're problems. Johnson Controls is reinventing building efficiency.

Learn more .

Lower costs. Increase operational efficiency. Detect problems before they're problems. Johnson Controls is reinventing building efficiency.

Learn more .

Lower costs. Increase operational efficiency. Detect problems before they're problems. Johnson Controls is reinventing building efficiency.

Learn more .

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Need portable cooling?

Rent or buy spot coolers from full-service locations nationwide. On call “24/7”. Primary, supplemental or emergency cooling. Atlas Sales & Rentals, Inc., or call (800) 972-6600.

Click here for more info

Sloan Performance Also Comes in White

Mitsubishi Electric Cooling & Heating is transforming HVAC with advanced Variable Refrigerant Flow (VRF) zoning solutions that totally redefine efficiency. VRF zoning systems offer lower lifecycle costs, less maintenance, better performance and reliability which lead to increased overall building efficiency. And all at a price that fits within your budget. Let Mitsubishi Electric help you redefine your HVAC efficiency as well as what you can achieve in your buildings.
Learn more www.mitsubishipro.com/redefined

comments powered by Disqus