05/01/2012

Facility Management Cost Trends: Surgery Center Build-Outs

Comparative Building Costs: Surgery Center Build-Outs

 
  • /Portals/1/images/Magazines/2012/0512/B_0512_FacilityCost3.jpg

    Surgery Center #1

  • /Portals/1/images/Magazines/2012/0512/B_0512_FacilityCost1.jpg

    Surgery Center #1
    View Larger

  • /Portals/1/images/Magazines/2012/0512/B_0512_FacilityCost4.jpg

    Surgery Center #2

  • /Portals/1/images/Magazines/2012/0512/B_0512_FacilityCost2.jpg

    Surgery Center #1
    View Larger

Surgery Center #1
Housed within approximately 7,700 square feet of an existing medical plaza, the new ambulatory surgery center and gastrointestinal laboratory includes a new waiting area, private consultation area, pre-operatory beds, nurses’ station, endoscope procedure rooms, and recovery area.

The project goal was to design a comfortable yet aesthetically pleasing surgery facility in a cost-effective manner. Patients enter through a luxurious waiting room; walls are lined in iridescent brown wall coverings, with modern golden furniture and a granite-like solid surface on reception area countertops. The center offers several procedures and required specialized equipment and rooms. A medical equipment consulting company ensured proper equipment purchases and maintained delivery coordination during construction.

Surgery Center #2
This medical office building is part of a corporate campus. The first floor houses the ambulatory surgical center while medical tenant suites take up the remainder of the building. A primary concern was to segregate the surgical center from the rest of the tenants while allowing for unconstrained primary building circulation. The design minimizes circulation and maximizes potential tenant development.

The surgical center includes four operating rooms and five private pre-operatory rooms with space for a sixth. In addition, there is a 7-bay adult recovery area and one minor procedure room with space for a second, a central sterile department, medication/work room, staff spaces, public waiting room, consultation room, and business office.

 

 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Bluebeam® Revu® simplifies digital facilities document management from design review to leveraging as-builts, maintenance manuals and O&Ms submittals.

 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Bluebeam® Revu® simplifies digital facilities document management from design review to leveraging as-builts, maintenance manuals and O&Ms submittals.

 


 
comments powered by Disqus

Sponsored Links