Cell Phone Coverage Case Studies

BUILDINGS - Smarter Facilities Management

01/25/2013

Cell Phone Coverage Case Studies

 

Case Study #3:
Heritage Plaza - Houston, TX

BUILDING TYPE
A 53-story building with 1,150,000 square feet of leasable office space.

CHALLENGES
The congested nature of downtown Houston caused weak wireless coverage in the building. Prior to signing a 12-year, 10-story lease, Deloitte & Touche USA, LLP required Heritage Plaza owners to rectify the issue of weak signal in the space.

SOLUTION
An active, distributed antenna system (DAS) network, which consists of a neutral host that allows all wireless carriers to come on and offers dedicated capacity to the space.

PAYBACK IMPACT
The DAS infrastructure became a competitive differentiator for Heritage Plaza. A major, multi-floor tenant signed upon installation, with many new tenants following.


Pages: 1  2  3  4  View All  
 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.

When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality. 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.

When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality. 


 
comments powered by Disqus
comments powered by Disqus