With building owners and managers so busy, roofs are unlikely to get much attention until they become troublesome. Our goal in this column is to focus on some proactive steps beyond the routine bi-annual inspections.

The first of these actions involves nothing more than taking a good hard look at who is currently accessing your roofs. Most low-slope roofs are used as equipment platforms. This means people have to get up there to perform maintenance, change filters, install new equipment, and make repairs. Unfortunately, roofs are also used as a place to take a smoke break when access is easier than wending ones way to a ground floor exit or break area. During the World Series, March Madness and other sport playoffs, roofs sprout radio and TV antennae as well.

People problems
Access to the roof, per se, is not evil, but the associated traffic patterns and work habits are rarely to the roof's benefit. A typical scenario is one where a worker accesses the roof through a roof scuttle or penthouse door. Naturally the worker is carrying tools or equipment. Just setting the toolbox on the roof membrane while climbing through the roof hatch is likely to do puncture damage. Next, the mechanic heads for the area where he needs to be. That will always be the most direct route, regardless of any aesthetically pleasing rectangular walkway previously installed. Arriving at the work point, the toolbox is again set down in order to remove a sheet-metal access door. Somehow, human nature being what it is, the door will be stood leaning against the HVAC unit, and gravity being what it is, one corner will dig (gouge) into the roof membrane.

Consequences of these random acts
The first issue is one of punctures. Many roof membranes are astonishingly thin. Many single-ply membranes are only 0.045 inches thick. Modified bitumens are somewhat thicker, with the cap sheet about 0.160" and the base another 0.1". Even a 4-ply built-up roof is only about 1/8" to 1/4" thick, so all membranes are pretty thin. Even a Galvalume-coated steel roof is usually only 24 or 26 gauge (0.021 to 0.026"). It doesn't take much to dent or puncture these materials. Roofs membranes are especially vulnerable when they have blisters or ridges.

Enhancing puncture resistance can take many forms. For single-ply membranes, increasing membrane thickness at the design stage can be very cost effective, as the labor for installing a 90 mil (0.090") sheet is hardly more than for a 45 mil sheet. Using a polyester-reinforced SBS cap sheet as a walkway on BUR and Mod Bit systems has proven itself many times over. However, the walkway needs to be put directly on the membrane, not over an installed gravel layer.

Wood "duck-boards" installed over sleepers provides a very high impact and traffic resistant surface. However, being out in the weather the wood itself, (even when treated), has a short life. Moreover, as the nails back out or the walkway disintegrates, the walkway itself becomes a hazard.

On bituminous roofing systems, one way to enhance "sleeper" or dunnage protection is to first install a polyester reinforced SBS modified cap sheet. For new design, this is installed directly over the bituminous membrane, fully adhered with hot asphalt or cold adhesive, torched in place, or using one of the newer self adhering materials. If a flood coat and gravel are used as surfacing, this goes around the cap sheet/walkway, not onto it. Figure 1 illustrates such an application. (Drawing courtesy of the Canadian Roofing Contractors Association). Note that this method would work to support pipes and rooftop equipment as well as duckboards.

In a retro situation, it is necessary to remove the flood coat and gravel, generally by using a 'spud-bar', and of necessity in cool weather when the bitumen is brittle and easy to shatter. If the membrane has been damaged by this step, patch it with another piece of Modified Sheet or BUR ply sheet prior to the application of the walkway sheet.


Pages: 1  2  View All  
 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Bluebeam® Revu® simplifies digital facilities document management from design review to leveraging as-builts, maintenance manuals and O&Ms submittals.

 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Bluebeam® Revu® simplifies digital facilities document management from design review to leveraging as-builts, maintenance manuals and O&Ms submittals.

 


 
comments powered by Disqus

Related Products

Furniture
Interiors
Building Automation

Sponsored Links