09/25/2006

14 Crosby Drive, Bedford, MA

2006 Project Innovations recipient, submitted by Boston Properties Inc.

 

Built-to-suit in 1981, this 3-story steel-and-masonry office building was under a 25-year lease until 2005.

Vacant until this recent upgrade, the modernization project included redesigning the 3-story lobby space and renovating the restrooms and other common areas. Exterior lighting and entrances were also updated to increase curb appeal. The modernization spurred a master plan for repositioning the entire Bedford Office Park (where the building is located), including a revised lighting scheme, revised site signage, landscaping, and an improved parking layout.

Special Design Feature
The outdated building was not ADA compliant. Restrooms and elevators did not satisfy accessibility requirements. Elevator controls, call buttons, and lanterns were replaced to reach compliance. All of the restrooms in the building were stripped of their original finishes and redesigned to meet ADA regulations for stall dimensions. Fixture heights also were adjusted to accommodate compliance.

Design/Construction Challenge
The original lobby did not have sufficient lighting or a clear sense of entry. The existing monumental stair, a main focal point of the lobby space, was masked by drywall, which created a claustrophobic look and feel. Designers removed cluttering elements and substituted drywall with glass and lighter materials. They also upgraded the lighting scheme.

 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

Bluebeam® Revu® simplifies digital facilities document management from design review to leveraging as-builts, maintenance manuals and O&Ms submittals.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

Bluebeam® Revu® simplifies digital facilities document management from design review to leveraging as-builts, maintenance manuals and O&Ms submittals.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.


 
comments powered by Disqus

Related Products

HVAC
Plumbing & Washrooms
Furniture

Sponsored Links