10/01/2007

The Villages at Samaritan House, Ft. Worth, TX

Project Innovations 2007

 

 

Submitting Company:
CM Architecture PA (dba CMA), Ft. Worth, TX

Project Team: (not all-inclusive)
Hemphill Samaritan House LP, owner; CM Architecture PA (dba CMA), architect; Carleton Construction, general contractor; Coach Realty Services Inc., developer; Laramide Cos. Inc., construction manager; AEC Environmental Consultants, environmental consultant; Grant Engineering, civil engineer; SCA Consulting Engineers, structural engineer; HG Engineering, mechanical engineer; Greener Pastures Landscape Inc., landscape.

Project Specifics:
Building type/use: mixed-use/multi-family housing

Square footage: 98,326 square feet

Project cost: $10.5 million

Project completion: June 2006

Product Suppliers: (not all-inclusive)
Acme Brick Co. | Armstrong | Atrium Windows and Doors | Autodesk Inc. | Evolve Furniture Group | FireKing Security Group | Haworth Inc. | James Hardie Intl. | Mohawk Carpet | Momentum Textiles | National Furniture | Schindler Elevator Corp. | The Sherwin-Williams Co. | TAMKO Building Products Inc. | Versteel | Vistawall

In another long-anticipated step in the fulfillment of the organization's mission, The Villages at Samaritan House provide affordable housing for HIV-positive individuals, allowing them to live in an apartment with their families. The renovation of an existing building and the construction of a new one provided 66 apartment units. New offices, conference rooms, private and group counseling areas, green areas, and playgrounds are just a few of the many amenities of this development.

Special Design Features
The exterior of the building has an urban loft feel created through the use of red brick, metal awnings, large windows, projecting balconies, and a flat roof. Each apartment unit ranges from 825 square feet to 1,389 square feet, with large windows (providing ample daylight), a balcony, a washer/dryer, one or two bathrooms (depending on the unit), full kitchens, a dining area and pantry, and Internet capability.

Design/Construction Challenge
Money was the most prevalent challenge for this project; in fact, the design began before the land was purchased, and funding was not secured until months after the design had begun. Once the design and budget were finalized, rising construction costs due to Hurricane Katrina caused numerous trips back to the drawing board to re-evaluate the design to stay within the limited budget. 

 

Connectrac wireways offer discrete power and technology connectivity in open interior spaces of all kinds; affordably, quickly and with long-term flexibility.



When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.

Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.


Mitsubishi Electric’s H2i R2-Series heat pumps provide 100% heating capacity down to 0° F and simultaneous heating and cooling down to -4° F delivering year-round comfort, regardless of climate zone.

Connectrac wireways offer discrete power and technology connectivity in open interior spaces of all kinds; affordably, quickly and with long-term flexibility.



When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.

Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.


Mitsubishi Electric’s H2i R2-Series heat pumps provide 100% heating capacity down to 0° F and simultaneous heating and cooling down to -4° F delivering year-round comfort, regardless of climate zone.

 
comments powered by Disqus

Related Products

Envelope and Structural
Furniture
Furniture

Sponsored Links