Industry News




 

07/02/2010

VA To Install Solar Photovoltaic in New Mexico

The Department of Veterans Affairs (VA) will install a solar photovoltaic system in Albuquerque

 
VA To Install Solar Photovoltaic in New Mexico

The Department of Veterans Affairs (VA) has awarded a contract for approximately $20 million to install a solar photovoltaic (PV) system at the Raymond G. Murphy VA Medical Center in Albuquerque using American Recovery and Reinvestment Act (ARRA) funding. It will be the largest PV system in New Mexico. 

 

The 3.2 megawatt solar PV system is estimated to produce up to 20 percent of the medical center’s annual electricity usage. The Eaton Corporation will design and install the PV system throughout the site, including car port and roof-mounted arrays, as well as implement a building-integrated system to help reduce demand from the local utility grid.

 

“The solar energy will be directly converted to usable electricity by being converted from DC to AC by the use of inverters in the system, then tied directly into our electrical distribution system,” said Bob Bruick, energy engineer for the medical center.

 

Five different areas will be used for solar panel installations, including two roof tops and three parking areas, which will be provided with covered parking canopies with solar panels on top. 

 

Work to finalize the design is expected to begin in a few weeks, with actual installation of panels to start later this summer. Bruick expects the project to be completed in early 2011. 

 

The VA selected the Albuquerque site based on results from feasibility studies to determine the optimal locations for on-site renewable energy projects. The VA’s goal is to increase renewable energy consumption to 15 percent of annual electricity usage by 2013.
 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Add highly responsive multi-zone comfort to any building project, in any climate. Our CITY MULTI H2i R2- and Y-Series VRF systems give you flexibility to fit the needs of any building. Enjoy 100% heating capacity at 0°F outdoor ambient, and 85% heating capacity at -13°F outdoor ambient.  For more information, log on to www.mitsubishipro.com


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Add highly responsive multi-zone comfort to any building project, in any climate. Our CITY MULTI H2i R2- and Y-Series VRF systems give you flexibility to fit the needs of any building. Enjoy 100% heating capacity at 0°F outdoor ambient, and 85% heating capacity at -13°F outdoor ambient.  For more information, log on to www.mitsubishipro.com

 
11/21/2014

Framework allows users a better look at roofing's environmental impact.

11/20/2014

Study finds paper towel dispensers carry far fewer germs.

11/19/2014

Tool will help manage information during power outages.

11/18/2014

Requirements include energy, IEQ, and sustainability updates.

11/17/2014

Group of 17 properties earn energy efficiency designation.

11/14/2014

Water conservation efforts see results.

11/13/2014

Study shows sustainable investments weather the winter.

11/12/2014

Standard focuses on occupant health.

11/11/2014

EPA says cleanup will cost hundreds of thousands of dollars.

11/10/2014

Methane will be used as a fuel source.

11/07/2014

ASTM to target roofing material diversion rates. 

11/06/2014

ORNL scientists look to the future of renewable energy integration.

11/05/2014

Lawsuits unlikely to convince polluters to change opposition to legislative reform. 

11/04/2014

Green building investment jumps in 2013. 

11/03/2014

Study shows difference between reported and measured occupant behavior

10/31/2014

Report shows energy modeling as key to improving building performance

10/30/2014

Report shows healthy features and practices yield results.

10/29/2014

USGBC announces two more years to prepare for LEED v4.

10/28/2014

Current projects could replace up to 8% of the Army’s energy use.

10/27/2014

Report shows increased occupant engagement in offices with green features.

Page 1 of 47
FirstPrevious[1]2345678910NextLast

Upcoming Webinars

Sponsored Links