Industry News




 

05/04/2011

BP Alaska Penalized $25 Million for Alaskan North Slope Oil Spill

 
BP-Alaska-Spill

The U.S. Environmental Protection Agency (EPA), the U.S. Department of Justice and the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA) have announced that BP Exploration Alaska, Inc. will pay a sum of $25 million in civil penalties for spilling more than 5,000 barrels of crude oil on the North Slope of Alaska.

This penalty is the largest per-barrel penalty of any recorded oil spill.

“Today’s settlement with BP Alaska imposes a tough penalty and requires the company to take action to prevent future pipeline oil spills on the Alaska North Slope,” says Cynthia Giles, assistant administrator for EPA’s Office of Enforcement and Compliance Assurance.  “The Clean Water Act gives the U.S. authority to assess higher penalties when oil spills are the result of gross negligence, and this case sends a message that we intend to use that authority and to insist that BP Alaska and other companies act responsibly to prevent pipeline oil spills.”

The incident occurred in March, 2006, when BP Alaska spilled around 5,054 barrels of crude oil on the North Slope in Alaska – followed by a second spill of 25 barrels in August 2006.  The spills were determined to have occurred as a result of failure of BP Alaska to properly inspect and maintain the pipeline.

PHMAS issued a Corrective Action Order to BP Alaska that addressed the pipeline’s risks and ordered pipeline repair or replacement.  When BP Alaska did not fully comply with the terms of the corrective action, PHMSA referred the case to the Department of Justice.

Of the $25 million penalty, $20.05 million will be deposited in the Oil Spill Liability Trust Fund established under the Clean Water Act.  The remainder, $4.95 million, will be paid to the U.S. Treasury.  The funds paid to the Oil Spill Liability Trust Fund will be used to finance federal response activities and provide compensation for damages sustained from future discharges or threatened discharges of oil into water or adjoining shorelines. 

The consent decree is subject to a 30-day public comment period and final court approval.

More information on the settlement: www.epa.gov/compliance/resources/cases/civil/cwa/bpnorthslope.html

Cement Manufacturer Penalized $1.4 Million

EPA Fugitive Joseph DeMatteo Sentenced

EPA Fugitive Albania Deleon Arrested

 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Add highly responsive multi-zone comfort to any building project, in any climate. Our CITY MULTI H2i R2- and Y-Series VRF systems give you flexibility to fit the needs of any building. Enjoy 100% heating capacity at 0°F outdoor ambient, and 85% heating capacity at -13°F outdoor ambient.  For more information, log on to www.mitsubishipro.com


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Add highly responsive multi-zone comfort to any building project, in any climate. Our CITY MULTI H2i R2- and Y-Series VRF systems give you flexibility to fit the needs of any building. Enjoy 100% heating capacity at 0°F outdoor ambient, and 85% heating capacity at -13°F outdoor ambient.  For more information, log on to www.mitsubishipro.com

 
11/20/2014

Study finds paper towel dispensers carry far fewer germs.

11/19/2014

Tool will help manage information during power outages.

11/18/2014

Requirements include energy, IEQ, and sustainability updates.

11/17/2014

Group of 17 properties earn energy efficiency designation.

11/14/2014

Water conservation efforts see results.

11/13/2014

Study shows sustainable investments weather the winter.

11/12/2014

Standard focuses on occupant health.

11/11/2014

EPA says cleanup will cost hundreds of thousands of dollars.

11/10/2014

Methane will be used as a fuel source.

11/07/2014

ASTM to target roofing material diversion rates. 

11/06/2014

ORNL scientists look to the future of renewable energy integration.

11/05/2014

Lawsuits unlikely to convince polluters to change opposition to legislative reform. 

11/04/2014

Green building investment jumps in 2013. 

11/03/2014

Study shows difference between reported and measured occupant behavior

10/31/2014

Report shows energy modeling as key to improving building performance

10/30/2014

Report shows healthy features and practices yield results.

10/29/2014

USGBC announces two more years to prepare for LEED v4.

10/28/2014

Current projects could replace up to 8% of the Army’s energy use.

10/27/2014

Report shows increased occupant engagement in offices with green features.

10/23/2014

Study shows seven key areas to increase worker engagement. 

Page 1 of 47
FirstPrevious[1]2345678910NextLast

Upcoming Webinars

Sponsored Links