Industry News




 

10/28/2011

Best Practices: Fire Readiness

 
Best Practices: Fire Readiness

115,500 structure fires occur annually in non-residential properties according to NFPA estimates – Do you have the best practices in place for when fire strikes?  These fires account for $3.1 billion in direct property damage.

Cintas Corporation has released a list of best practices to assist building owners and facility managers ensure that their properties are prepared for the worst:

Implement a Fire Emergency Evacuation Plan – Emergency response is easier when everyone knows their respective responsibilities. Establish a detailed fire emergency evacuation plan that dictates how to respond, when to respond and identifies a path of egress. If employees have special needs or require special attention, address these details in the plan.

Establish a Fire Prevention Plan – A fire prevention plan provides facilities with documentation outlining the employees responsible for identifying combustible materials, fire hazards and heat-producing equipment. It also outlines the procedures necessary to prevent potential emergencies. The fire prevention plan should be communicated with all employees and available in writing for review at any time.

Train Team Members – On an annual basis, the Occupational Safety and Health Administration (OSHA) and NFPA require fire extinguisher training for employees. Every employee should receive required training and be briefed on new or updated regulations.

Maintain Emergency and Exit Lights – To ensure paths of egress and exits stay illuminated at all times, implement a routine maintenance plan to check lights and replace broken or burnt out bulbs. In addition, regularly test emergency backup power and exit lights to confirm they are functioning.

Practice Proper Housekeeping Techniques – Daily housekeeping tasks play an important role in keeping facilities clear of fire hazards. Make sure trash and packing materials are in metal containers with tight-fitting lids. Clean up flammable materials immediately, including chemical spills and oil to reduce the risk of fire. Likewise, extra storage and equipment should be in proper storage areas clear of aisles or fire exits and not interfering with automatic sprinkler systems.

Create a Fire Emergency Response Team – Develop a team of individuals who are trained and educated in fire emergency plan procedures and are willing to enforce fire safety and prevention methods throughout the building. The team members will assist others during a fire emergency and help guide people to safety in case of an emergency.

Preventative Maintenance – Enlisting a licensed and certified fire protection company provides facility managers with quality inspections, safety tests and repairs to fire protection equipment.  Establish frequencies as outlined in NFPA code by the equipment manufacturer and the local Authority Having Jurisdiction (AHJ).

Utilizing these broad stroke practices and implementation of these ideas can go a long way toward making sure your facility, staff, and wallet are safe from fire.

How to Comply with Your Annual Fire Inspection

The Basics of Fire Protection

Fire Doors 101

 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Add highly responsive multi-zone comfort to any building project, in any climate. Our CITY MULTI H2i R2- and Y-Series VRF systems give you flexibility to fit the needs of any building. Enjoy 100% heating capacity at 0°F outdoor ambient, and 85% heating capacity at -13°F outdoor ambient.  For more information, log on to www.mitsubishipro.com


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Add highly responsive multi-zone comfort to any building project, in any climate. Our CITY MULTI H2i R2- and Y-Series VRF systems give you flexibility to fit the needs of any building. Enjoy 100% heating capacity at 0°F outdoor ambient, and 85% heating capacity at -13°F outdoor ambient.  For more information, log on to www.mitsubishipro.com

 
11/21/2014

Framework allows users a better look at roofing's environmental impact.

11/20/2014

Study finds paper towel dispensers carry far fewer germs.

11/19/2014

Tool will help manage information during power outages.

11/18/2014

Requirements include energy, IEQ, and sustainability updates.

11/17/2014

Group of 17 properties earn energy efficiency designation.

11/14/2014

Water conservation efforts see results.

11/13/2014

Study shows sustainable investments weather the winter.

11/12/2014

Standard focuses on occupant health.

11/11/2014

EPA says cleanup will cost hundreds of thousands of dollars.

11/10/2014

Methane will be used as a fuel source.

11/07/2014

ASTM to target roofing material diversion rates. 

11/06/2014

ORNL scientists look to the future of renewable energy integration.

11/05/2014

Lawsuits unlikely to convince polluters to change opposition to legislative reform. 

11/04/2014

Green building investment jumps in 2013. 

11/03/2014

Study shows difference between reported and measured occupant behavior

10/31/2014

Report shows energy modeling as key to improving building performance

10/30/2014

Report shows healthy features and practices yield results.

10/29/2014

USGBC announces two more years to prepare for LEED v4.

10/28/2014

Current projects could replace up to 8% of the Army’s energy use.

10/27/2014

Report shows increased occupant engagement in offices with green features.

Page 1 of 47
FirstPrevious[1]2345678910NextLast

Upcoming Webinars

Sponsored Links