Industry News




09/19/2012

A Facility Owner’s Guide: Leverage the “I” in BIM Project Delivery

By Michael Ruiz

 
BIM is becoming an increasingly important tool in the facility manager's arsenal.

Operating and maintaining high performance buildings requires a sophisticated organization. With careful preparation and planning, these facilities can work wonders. Taking care of them requires a well-managed project delivery system, complex business processes and an expert operation and maintenance (O&M) team.

 

Architects, engineers and contractors have long embraced BIM, but ultimately the BIM models they create will belong to the building owners. As such, it is imperative that they have organizational processes and technology-enabled tools to facilitate the transfer of information from design and construction to operations. Together, these processes and tools will enable reporting and calculation of the “big data” they gather. We refer to this concept of project delivery as the Integrated Model State, or IMS.

 

The central component of the IMS is the BIM Data Specification. This document outlines the owner’s BIM project information requirements for the design and construction teams and other service providers. These requirements identify the owner as the primary data consumer and the project delivery team as the primary data author. In this specification, all major tasks and deliverables associated with the creation and delivery of BIM data are described for the AEC community.

 

Articulating BIM requirements is only half of the battle

 

To fully realize the promise of BIM, owners must also learn how to organize model data as it arrives. This means extracting and validating model data, managing the process of making changes and, finally, leveraging that data toward business goals and objectives. An information exchange platform enables facility owners to extend their business processes and workflows to their mobile devices and to their business partners using industry standards. Utilizing an information exchange across project stakeholders enables easy collaboration across systems and companies.

 

Ultimately, success depends on having sound business processes, tools and protocols for collaboration. For now, let us consider the IMS as a framework in which specific applications assist owner BIM processes and workflows.

 


Pages: 1  2  View All  
 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.

When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality. 

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.

When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality. 

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.


 
comments powered by Disqus
07/02/2015

Sustainable parking leaders recognized.

07/01/2015

Design ‘scatters’ sound without affecting aerodynamics.

06/30/2015

Survey shows lack of concrete commitment to efficiency improvements.

06/29/2015

Guideline will protect building water systems.

06/26/2015

Development could mitigate urban heat island effect.

06/25/2015

New web application can identify energy savings opportunities.

06/24/2015

Report shows refrigerants could reduce GHG emissions, energy use.

06/23/2015

Sustainable design tied to strong financial performance.

06/22/2015

Human wellbeing guidelines grow throughout North America.

06/19/2015

Larger, private buildings now included in rankings.

06/18/2015

Diversion rates increase nearly 10% in 2013.

06/17/2015
Study shows lack of preparedness, suggests improvements to increase resiliency.
06/15/2015

Surveyed workers feel unsafe, doubt employer readiness for weather events. 

06/12/2015

Better Buildings Challenge improvements demonstrate energy savings.

06/11/2015

New technology provides privacy and sunlight.

06/10/2015

Program will provide best practices, green certification for landscape design.

06/09/2015

Improve recycling up to 20% with an easy switch.

06/08/2015

OSHA and Health Canada to improve hazard communications for worker safety.

06/04/2015

Lighting, building automation retrofits show highest rate of return.

06/03/2015

New OSHA guide to ensure fair treatment, safe working conditions.

Page 1 of 54
FirstPrevious[1]2345678910NextLast

Sponsored Links