Industry News




 

06/23/2014

5 Tips for Summer Floods

What to do when the rain stops and the flood recedes

 
Flood

With summer storm season comes the potential for flooding forecasts. If your facility is in a high-risk area, this reference guide from the Institute of Inspection, Cleaning, Restoration and Certification (IICRC) can help you minimize the damage.

1) Be prepared. If the storm is imminent and you know your facility is at risk, round up valuable items or documents and store them in a secure and dry location. Clean out gutters and downspouts and ensure your sump pump is working. Move items to higher floors or raise them off the floor to minimize damage.

2) Stay safe. Did the flood waters reach your building? If so, shut off all electricity in the affected areas, even if you think there’s an outage – power is often restored without notice, which could present a shock hazard. When you enter your damaged building, be aware of its structural integrity and other potential hazards, such as falling debris. Stay out of the floodwaters as much as you can to avoid the risk of injury. Also make sure you’re wearing the right personal protective equipment – protective clothing, sturdy shoes, gloves, eye protection and a paint respirator can help protect you from microorganisms that grow quickly after floods.

3) Clean quickly. Control or minimize the speed of mold growth by keeping air moving through the space with open windows and doors. Mold thrives in moist environments (particularly ones with stale air, food sources like paper and wood, and temperatures between 68-86 degrees F.), so maintain a steady supply of fresh air. This discourages the growth of mold and other microorganisms and also helps guard against inhalation risks.

4) Be thorough. Remove and dispose of anything wet and porous, such as mattresses, pillows, molding, insulation, and damaged portions of walls. Floor coverings like carpet, pads, laminate, tile, and sheet vinyl must also be disposed of. Wood flooring should be removed so you can expose, dry, and clean wet saturation pockets underneath. Some items, such as furniture and clothing, can be salvaged by washing them in hot water, soaking them in detergent and using a disinfectant solution. You’ll also need to disinfect structural areas such as wall cavities, studs, and other fixtures – this can be done by pressure washing with detergent solutions from top to bottom.

5) Dry everything. After disinfecting, the entire space needs to dry thoroughly before you can begin reconstruction. Surfaces may feel dry to the touch, but that doesn’t mean they are truly dry. If you start reconstruction too early, you may end up with dry rot, ongoing structural damage, or adverse effects on human health. Consider a professional moisture assessment to make sure it’s safe to proceed.

 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Add highly responsive multi-zone comfort to any building project, in any climate. Our CITY MULTI H2i R2- and Y-Series VRF systems give you flexibility to fit the needs of any building. Enjoy 100% heating capacity at 0°F outdoor ambient, and 85% heating capacity at -13°F outdoor ambient.  For more information, log on to www.mitsubishipro.com


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.


When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality.

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.

Add highly responsive multi-zone comfort to any building project, in any climate. Our CITY MULTI H2i R2- and Y-Series VRF systems give you flexibility to fit the needs of any building. Enjoy 100% heating capacity at 0°F outdoor ambient, and 85% heating capacity at -13°F outdoor ambient.  For more information, log on to www.mitsubishipro.com

 
11/21/2014

Framework allows users a better look at roofing's environmental impact.

11/20/2014

Study finds paper towel dispensers carry far fewer germs.

11/19/2014

Tool will help manage information during power outages.

11/18/2014

Requirements include energy, IEQ, and sustainability updates.

11/17/2014

Group of 17 properties earn energy efficiency designation.

11/14/2014

Water conservation efforts see results.

11/13/2014

Study shows sustainable investments weather the winter.

11/12/2014

Standard focuses on occupant health.

11/11/2014

EPA says cleanup will cost hundreds of thousands of dollars.

11/10/2014

Methane will be used as a fuel source.

11/07/2014

ASTM to target roofing material diversion rates. 

11/06/2014

ORNL scientists look to the future of renewable energy integration.

11/05/2014

Lawsuits unlikely to convince polluters to change opposition to legislative reform. 

11/04/2014

Green building investment jumps in 2013. 

11/03/2014

Study shows difference between reported and measured occupant behavior

10/31/2014

Report shows energy modeling as key to improving building performance

10/30/2014

Report shows healthy features and practices yield results.

10/29/2014

USGBC announces two more years to prepare for LEED v4.

10/28/2014

Current projects could replace up to 8% of the Army’s energy use.

10/27/2014

Report shows increased occupant engagement in offices with green features.

Page 1 of 47
FirstPrevious[1]2345678910NextLast

Upcoming Webinars

Sponsored Links