Industry News




05/03/2004

EFCO System 433 Storefront Offers Expanded Design Options

 

EFCO Corp. offers architects, installers, and building owners an array of design, efficiency, and performance benefits in the System 433 Triple Set™ storefront framing system.

 

System 433 Triple Set™ is a thermal framing system accommodating three glass planes, which lets architects create a shadow-box effect using glass thicknesses of up to one inch. With 90˚ and 135˚ inside and outside corner mullions, System 433 allows multi-faceted elevations. Stock length or fabricated framing plus anodized or painted finishes provide virtually unlimited options to make designs more expressive.

 

Installers will find much to appreciate in the System 433 as well. All joints and horizontal mullions are square cut, allowing quick fabrication in the field along with shop fabrication of “ladders” that can be transported as a unit to the site for quick installation. All joints are fastened with #12 screws to simplify fabrication and strengthen the system for transportation without damage to the joinery system. Glass planes may be inside or outside glazed for construction flexibility, and uniform exterior and interior glazing gasket helps optimize gasket use. 

 

For building owners, the System 433 adds value through performance. Stock steel bars or custom-fabricated steel shapes are available for mullions, eliminating the cost of customer steel fabrication. Glazing of up to one-inch thickness expands the system’s energy-savings options.

 

EFCO Corp. is a leading U.S. manufacturer of aluminum windows, entrances, storefronts, and curtainwall systems for commercial architectural applications. For more information on the System 433 Triple Set™ storefront framing system or any of EFCO Corp.’s comprehensive line of fenestration products and services, call 1-800-221-4169 or visit (www.efcocorp.com).

 


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.

When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality. 

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.


Visit our website today to learn about the design flexibility of a Morton building and the endless possibilities of partnering with our designBUILD team.


Wood construction is both cost and energy efficient. Check out Morton Buildings and our designBUILD team online today to discover all the benefits of post-frame construction.

When choosing a metal-clad building for your next construction project, consider Morton Buildings, Inc., and their designBUILD team, we’ll make your dream a reality. 

We Can Help You Reduce Energy by 30%

Our mission is to help our customers manage their buildings' energy costs, improve reliability, and enhance performance while having a positive impact on the environment.
CLICK HERE to find out how.


 
comments powered by Disqus
09/03/2015

Arizona installation will provide 210 MW of renewable energy.

09/02/2015

Standard to create uniformity, common content for rating programs.

09/01/2015

Guidelines to improve safety of waterways.

08/31/2015

Occupant improvements help recruit new talent.

08/28/2015

Temperatures reach highest point since 1880.

08/27/2015

Large improvements drive water conservation on West Coast.

08/26/2015

Data breaches becoming more common.

08/25/2015

Research shows link between extreme weather events and long power disruptions.

08/24/2015

Specifications to improve wall resiliency.

08/21/2015

New resource can help FMs create scope of custodial work.

08/20/2015

Rule created to stem Legionnaires’ disease outbreak.

08/19/2015

Portable devices encourage sedentary workers to exercise while seated.

08/18/2015

PACE program to drive building improvements.

08/17/2015

Survey shows management systems can streamline work order process.

08/14/2015

Tool will help schools improve air quality.

08/13/2015

Proposed ASHRAE rule to improve communication about energy consumption, forecasts.

08/12/2015

Installations rise as electricity costs drop to an all-time low.

08/11/2015

Linear, low-bay/high-bay LEDs spotlighted as best choices for commercial retrofits.

08/10/2015

Wind, solar set for big increases.

08/07/2015

New requirement will cut food waste.

Page 1 of 56
FirstPrevious[1]2345678910NextLast

Sponsored Links