07/26/2010

You Want How Much for that Change Order?

Visit our Sponsor

Buildings At the Moment Logo, Helping Facilities Professionals Make Smarter Decisions
navigation left image Visit Buildings Online navigation divider Find Products and Vendors navigation divider Browse Case Studies navigation divider Watch New Videos navigation divider Contact Buildings Staff navigation right image
Buildings At the Moment Logo, Helping Facilities Professionals Make Smarter Decisions
You Want How Much for that Change Order?

Today's hyper-competitive construction market has some building owners giddy about below-budget bids; others are anxious about what will happen to that pricing after the project is awarded (not to mention the quality of the end product).

Change orders and less-than-stellar performance can render that low bid a poor overall value. Public owners who take advantage of job order contracting (JOC) have greater cost control of the project – before and after – while maintaining quality, schedule, and collaboration.

Read more about job order contracting …

 
Wood Gasification: Smart Alternative?  

Wood Gasification: Smart Alternative?

Interest in renewable energy is heating up, and building owners are exploring an old technology with a proven track record: wood gasification. Learn more about the pros and cons of turning wood into energy.

Read more about wood gasification …

 
Multi-Family Community Takes on Health of Residents and Environment Multi-Family Community Takes on Health of Residents and Environment
Affordable housing isn't the only benefit of Casa Dominguez.
Click here for complete article…
New Study Examines Shingle Performance in Hurricanes New Study Examines Shingle Performance in Hurricanes
How well do asphalt shingle roofs stand up in tropical storms?
Click here for complete article …
Smart Grid Funding Awarded to Illinois Smart Grid Funding Awarded to Illinois
Lincoln's home state is poised to become the nation's smart grid leader.
Click here for complete article …
 
Hidden Risks in the Current Construction Environment Hidden Risks in the Current Construction Environment
Given the current construction environment, there are new and magnified risks that you should know how to alleviate.
Click here for complete article …
Why Contractor Safety is Important for an Owner Why Contractor Safety is Important for an Owner
A dedicated commitment to safety by the owner and contractor will keep risks and construction costs in check.
Click here for complete article …
First Woodchip Gasification Plant Installed in a Public School First Woodchip Gasification Plant Installed in a Public School
The Hartford Central School District will save up to 70 percent of fuel oil costs in a single heating season with woodchip gasification technology.
Click here for complete article …
 
Professional Air Washer Plus by SANYO Amalgam CFL Triple 4-Pin family by BULBRITE CP 506 and 572 Smoke and Acoustic Sealants by Hilti
Professional Air Washer Plus by SANYO
This air purification system suppresses up to 99 percent of air pollutants using electrolyzed water technology.
Click here for more information on this product…
Amalgam CFL Triple 4-Pin family by BULBRITE
BULBRITE introduces energy efficient, pin-based compact fluorescent lamping with Amalgam technology.
Click here for more information on this product…
CP 506 and 572 Smoke and Acoustic Sealants by Hilti
The CP 506 and 572 Smoke and Acoustic Sealants reduce sound transmission and restrict smoke migration.
Click here for more information on this product…
 
Whitepapers Case Studies Catalogs
Visit our Whitepapers Visit our Case Studies Visit our Catalogs
Insulation Energy Savings: Key Issues and Performance Factors USPS Goes Solar Protect Your Parking Lot Investment
Visit our Whitepapers Visit our Case Studies Visit our Catalogs
Extend the life of an asphalt pavement, reduce greenhouse-gas emissions, and save petroleum resources.

Markar Hinges Make the Grade

Maintain your Parking Lot - Video Catalog

Click here to view Whitepapers… Click here to view Case Studies… Click here to view Catalogs…
 

Strategies for Stormwater
Preventing a Slip, Stumble, and Tumble
Keeping Your Insulation Dry

Retail Development Trends in a Changing Economy
Preserve and Conserve
LEED: Requirement or Viable Option?
Is Your Fire Alarm System Performing?
Thinking Outside the (Industrial Facility) Box
The Right Mix
Can the Air Be Cleared on IAQ?

July 26, 2010
 
Visit our sponsor
 
Subscribe to @ the Moment and other free newsletters!
 
Subscribe to @ the Moment and other free newsletters!