• Whitehall Ferry Terminal, New York, NY

    2006 Project Innovations recipient, submitted by Tishman Construction Corp.
    Sept. 25, 2006
    2 min read

    For 101 years, the Staten Island Ferry has been the only non-vehicular mode of transportation between Manhattan and Staten Island, transporting 20 million commuters annually on a scenic, 5-mile voyage across Upper New York Harbor.

    The new terminal includes a 19,000-square-foot waiting room, 10,000 square feet of office space, 10,000 square feet of ancillary support and ferry operation rooms, and 6,000 square feet of concessions. It replaces the original 1907 Whitehall Ferry Terminal, which was badly damaged in 1991 by a fire that completely destroyed its main waiting room. An interim waiting room opened in 1992. The new inter-modal Whitehall Ferry Terminal was designed to provide uninterrupted ferry serv­ice to 75,000 daily commuters plus tourists and create efficient connections to subway, bus, and taxi services.

    Special Design Features
    Reinforcing its “Gateway to Manhattan” image and location, the airy, contemporary building features a 75-foot-high entry hall with a glass façade that provides panoramic views of the Lower Manhattan skyline and New York Harbor. Above the terminal are photovoltaic solar panels, supplying a portion of the building’s power. Whitehall Ferry Terminal boasts a new, state-of-the-art heating and air-conditioning system, including a radiant floor, a high-tech public address system, and programmable interior and exterior LED signage capable of transmitting moving images and text in full color.

    Design/Construction Challenge
    As Lower Manhattan’s main transportation hub, the terminal required complex construction phasing to allow two of the three ferry slips to be in continuous operation for the duration of the project. Work was planned around a detailed schedule based on such items as removing a ferry slip from service, completing construction of each slip, providing access to the new slip for the ferry passengers, returning the slip to service, and removing the next slip from service.

    Voice your opinion!

    To join the conversation, and become an exclusive member of Buildings, create an account today!

    Sponsored Recommendations

    Sign up for our Newsletter
    Get the latest news and updates.

    Latest from Industry News

    Courtesy of Donna Newman Photography
    Brad Meltzer, host of “Decoded” on the History Channel and “Lost History” on H2, will deliver the Sunday, June 29 keynote at the 2025 BOMA International Conference & Expo.
    This question is one of the most important things you can ask yourself, especially when you’re struggling with exhaustion and burnout, says historian Brad Meltzer. The New York...
    May 7, 2025
    Courtesy of Something Fishy, Inc.
    This corporate office installation features an aquarium designed and installed by Something Fishy, Inc.
    Freshwater or saltwater fish give your building something extra that draws attention and brings people together. Here’s what you need to know about putting an aquarium into your...
    May 2, 2025

    Sponsored