Disruptions from extended power outages can cause problems beyond what’s covered by the minimum life-safety requirements. Here’s why code minimum isn’t the end of the story—and how you can prepare.

Key Highlights

  • Minimum life-safety systems may help occupants exit but leave buildings unable to support essential work during extended outages.
  • Asset management plans can reveal hidden dependencies, aging equipment, and vulnerabilities that threaten critical operations.
  • Prioritize backup power by identifying which functions must continue and comparing upgrade costs with the consequences of disruption.
  • Use scheduled equipment replacements to phase in resilience improvements and allow for future capacity and maintenance access.
  • Plan for disruptions to water and communications as well as electricity, and revisit resilience plans as buildings and operations change.

An extended power outage can expose weaknesses that a routine emergency-system test won’t reveal. The exit lights work, but the cooling shuts down. Equipment loses power, leaving the building unable to support the people or work inside it.

Facility owners have more reason than ever to prepare for those conditions. The U.S. averaged about three billion-dollar disasters per year in the 1990s, compared to an average of 20 annually for the past decade, according to Climate Central. In 2025 alone, those disasters cost the U.S. $115 billion.

The disruption can extend well beyond electricity. After Hurricane Helene, Asheville, North Carolina, went without safe tap water for 53 days, while cellular service was disrupted for weeks. Facilities also have to prepare for brownouts and rolling blackouts when utilities struggle to meet demand, sometimes with only hours of notice.

Unfortunately, many buildings still rely only on emergency-power systems sized to meet minimum life-safety requirements. Those systems may leave HVAC, communications, security, and other essential functions without backup power. Closing the gaps takes planning, but owners can spread the work across equipment replacements and other scheduled infrastructure improvements.

Why Code Minimum Falls Short

For many commercial buildings, minimum emergency-power requirements focus on helping occupants leave safely within a short period of time. Meeting them does not necessarily provide enough backup power to keep a building operating and provide the appropriate level of resiliency for these more significant interruptions experienced now.

Continued strain on the grid makes planning for resiliency upgrades more pressing. The North American Electric Reliability Corp. identified potential electricity supply shortfalls in 13 of 23 assessment areas over the next decade. Owners need to evaluate how long their buildings can operate without utility power.

Lighting illustrates the largest gap. A typical workspace may need around 50 foot-candles, depending on the work performed. Code-required emergency lighting averages one foot-candle along the exit path—enough to help people leave safely, but far below normal working conditions.

Other systems have similar gaps. Cooling, ventilation, and controls may have no backup power, leaving a building unusable even when its emergency systems function as intended. Hospitals have more extensive requirements, but staff still need to know which outlets and equipment will remain powered and whether those provisions support continued care.

Understandably, owners often hesitate to invest beyond code because the cost is immediate and the benefit is harder to quantify, especially without a prolonged outage on record. Adding up lost revenue, canceled services and displaced occupants can often change an owner’s mindset.

Additionally, relying on rental equipment or last-minute orders no longer works. Owners who once expected to secure generators or portable chillers on short notice will find that they’re not available.

Find the Weak Points in Existing Systems

An asset management plan gives facility teams a starting point. It documents critical equipment, its age, expected remaining service life and vulnerabilities, along with the systems and functions that depend on it.

The assessment should also establish what happens when each asset fails. Consider a university research building where a bank of ultralow-temperature freezers holds years of samples. The panel feeding them is 25 years old and was never connected to the building’s emergency system. An extended outage could destroy the samples and the research behind them even if the freezers themselves are in good condition.

That dependency is easy to miss when teams evaluate equipment in isolation. Following the power supply back through the building helps teams identify the components that could interrupt an otherwise reliable system.

The findings give owners a basis for prioritizing upgrades according to equipment condition and the consequences of failure.

Determine What Must Stay Online

Owners and facility teams need to agree on which activities must continue during an extended outage and the cost of not being able to perform the facility's expected functions. A hospital may need to maintain patient care, a university may need to protect research, dining, and housing, and a manufacturer may need to keep a production process running or shut it down safely to avoid losing product.

Those decisions determine which systems need backup support. They also help distinguish equipment that can remain offline for a few hours from equipment whose failure would cause immediate damage or disruption.

Then add the lens of the cost of providing that support with the likely cost of losing the function. Include the consequences beyond equipment damage. A campus that cannot house students may lose revenue and have to arrange alternative accommodations. A hospital that cancels elective procedures loses revenue and delays care.

Comparing these costs can help explain why aging electrical equipment deserves funding before a more visible improvement.

Phase Upgrades and Allow for Expansion

Equipment replacement cycles offer opportunities to improve resilience without undertaking every upgrade at once. When a major system reaches the end of its service life, evaluate what it would take to connect its replacement to emergency power. Where appropriate, that work may include adding a transfer switch and confirming that the backup system can carry the additional load.

Design those improvements with future flexibility in mind. Leave room for added capacity and access for repairs so the next upgrade doesn't require undoing work completed a few years earlier.

Power, communication, and water distribution deserve the same attention. Where feasible, loops and multiple connection points can provide another route when a component fails. On campuses, distributed systems can help limit an outage's reach while accommodating future expansion. The design needs to account for the connections between systems as well as the reliability of individual components.

The same thinking applies to communications. After Hurricane Helene, Verizon said it invested $38 million in western North Carolina, including more resilient fiber backhaul for its mountain network. Facility teams should consider how they will communicate if their usual cellular or internet service is unavailable.

Put the Assessment to Work

Resilience doesn't require one all-or-nothing project. An assessment establishes what the building has, what it cannot afford to lose, and where upgrades are needed.

Use those findings to set the sequence of improvements and revisit the plan as equipment, operations, and occupancy change. Each planned replacement offers a chance to address a known vulnerability and better protect critical operations.

Facility teams can't control the next storm or outage. They can decide how ready the building will be.

About the Author

Mark Brumfield

Mark Brumfield is CEO of HEAPY, a national engineering firm specializing in building systems, energy, sustainability, and resilience planning for healthcare, higher education, and other complex facilities.

Sign up for our eNewsletters
Get the latest news and updates

Voice Your Opinion!

To join the conversation, and become an exclusive member of Buildings, create an account today!